A question for @Flippa01. Is it possible with the processing method AUZ are using to start building the Sconi plant to a smaller capacity with additional trains being added on? or is the process and ore type such that engineering constraints would generally make this not possible due to process and or cost. Thank you in advance Ironlung.
- Forums
- ASX - By Stock
- AUZ
- Ann: Drilling extends nickel-cobalt resource potential at Sconi P
Ann: Drilling extends nickel-cobalt resource potential at Sconi P, page-397
Featured News
Add AUZ (ASX) to my watchlist
|
|||||
Last
0.8¢ |
Change
-0.001(11.1%) |
Mkt cap ! $11.18M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.8¢ | $34.02K | 4.190M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 3693178 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 4839817 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 3693178 | 0.008 |
47 | 20111270 | 0.007 |
22 | 7707599 | 0.006 |
19 | 10920398 | 0.005 |
7 | 4250000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 4839817 | 12 |
0.010 | 7732616 | 23 |
0.011 | 2581750 | 9 |
0.012 | 5414667 | 9 |
0.013 | 2250000 | 5 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
AUZ (ASX) Chart |