A question for @Flippa01. Is it possible with the processing method AUZ are using to start building the Sconi plant to a smaller capacity with additional trains being added on? or is the process and ore type such that engineering constraints would generally make this not possible due to process and or cost. Thank you in advance Ironlung.
- Forums
- ASX - By Stock
- Ann: Drilling extends nickel-cobalt resource potential at Sconi P
A question for @Flippa01. Is it possible with the processing...
Featured News
Add AUZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.18M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $5.243K | 655.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
34 | 15646053 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 2301583 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
34 | 15646053 | 0.007 |
28 | 43238955 | 0.006 |
15 | 28885199 | 0.005 |
9 | 5979750 | 0.004 |
2 | 2400000 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 2301583 | 14 |
0.009 | 4816204 | 13 |
0.010 | 3178763 | 21 |
0.011 | 2015770 | 12 |
0.012 | 4803367 | 8 |
Last trade - 10.00am 02/09/2024 (20 minute delay) ? |
Featured News
AUZ (ASX) Chart |
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online