WTM waratah minerals limited

Diamond hole 2 drilled to 700m, 200m deeper than planned. First...

  1. 195 Posts.
    lightbulb Created with Sketch. 390
    Diamond hole 2 drilled to 700m, 200m deeper than planned. First assays for diamond hole 1 expected next week! That hole started in 0.5% copper. The entire system is huge both laterally and vertically. I’m loving some of the new and upgraded diagrams. Joining the dots on this image, just that one lode is very decent
    and mineralised from surface.

    https://hotcopper.com.au/data/attachments/6965/6965263-ce93bf263baf31fb934cbcbbe5dfecca.jpg
    Plenty of extension drilling here too and where do they join up?

    https://hotcopper.com.au/data/attachments/6965/6965265-c70bd5b56b7f712a9407144de60c875c.jpg

    Surely someone will put their foot on it. The plant and tailings dam is already built IMHO.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
29.0¢
Change
0.005(1.75%)
Mkt cap ! $66.55M
Open High Low Value Volume
28.5¢ 29.0¢ 27.5¢ $46.15K 163.2K

Buyers (Bids)

No. Vol. Price($)
3 43276 29.0¢
 

Sellers (Offers)

Price($) Vol. No.
29.5¢ 40000 2
View Market Depth
Last trade - 14.31pm 31/07/2025 (20 minute delay) ?
WTM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.