Nice intersection!
I noticed though that there were things wrong with the cross-section:
- LCO-1 and LCO-2 parallel in plan but the 178m LCO-2 interval is shorter than the 132m LCO-1 interval
- intervals for LCO-1, LCO-2 and CMLCD010 all start at the wrong down-hole distance
- none of the three holes is sufficiently angled to the plane of the section to cause any material shortening of the intervals when drawn on section
The green lines are roughly where the intervals should be.
Not sure what it means except that the correct positions would make it harder to draw that nice vertical zone of mineralisation.
- Forums
- ASX - By Stock
- CPO
- Ann: Drilling intersects 169m @ 1.08% Cu grades up to 3.56% Cu
Ann: Drilling intersects 169m @ 1.08% Cu grades up to 3.56% Cu, page-9
-
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPO (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
0.001(2.94%) |
Mkt cap ! $7.126M |
Open | High | Low | Value | Volume |
3.5¢ | 3.5¢ | 3.5¢ | $389 | 11.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 40748 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.6¢ | 209256 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 40748 | 0.033 |
6 | 539563 | 0.032 |
3 | 355892 | 0.031 |
5 | 616699 | 0.030 |
1 | 35714 | 0.028 |
Price($) | Vol. | No. |
---|---|---|
0.036 | 209256 | 2 |
0.038 | 80000 | 2 |
0.040 | 100000 | 1 |
0.041 | 9979 | 1 |
0.042 | 99999 | 1 |
Last trade - 15.43pm 17/09/2024 (20 minute delay) ? |
Featured News
CPO (ASX) Chart |