AMD 0.00% 0.3¢ arrow minerals ltd

the word out is all is on track ... ( very nice thank you ) from...

  1. 2,306 Posts.
    the word out is all is on track ... ( very nice thank you )

    from the report today

    " BEDROCK CONDUCTOR DRILLING PROGRAMME
    Segue has received approval from the WA Department of Mines and Petroleum (DMP) for its maiden
    diamond and reverse circulation (RC) drilling programme at the E21 Target.

    The programme is designed to test four bedrock electromagnetic (EM) conductors which have been defined through both Moving Loop Electromagnetic (MLEM) and Fixed Loop Electromagnetic (FLEM) surveys.

    The four conductors (C1-4) are located around the northern edge of an interpreted intrusive complex (E21 Target) which lies within tenement E39/1731 (Figures 2a & 2b).


    Drilling contracts (both RC and diamond) have been awarded and the RC rig will be mobilised by the end of
    September. The diamond drill rig is likely to be onsite by the first week of October. The drilling programme
    is expected to take four weeks to complete.

    Segue’s highest priority drilling target, C1, will be drilled first with an RC pre-collar to approximately 300m
    and a diamond tail through the conductor plate, which has been modelled at 650m to the centre of the plate.

    A down-hole EM survey will be undertaken to provide a diagnostic test of the bedrock conductor. Conductors
    C2, C3 and C4 will be drilled with RC holes to target depths of 250m - 300m. The RC hole planned at C2 will
    test two interpreted conductor plate orientations (Figure 3). "

    go to link for pics

    http://www.aspectfinancial.com.au/d...Jyb3JwYWdlcy9wZGZkZWxheWVkLmpzcA==&popup=true
 
watchlist Created with Sketch. Add AMD (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $26.34M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
167 287086024 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 147399714 31
View Market Depth
Last trade - 11.17am 05/07/2024 (20 minute delay) ?
AMD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.