Fair to say the market has baked in a lot of this news previously - the company really will need the next wells to flow like E#2 not like G#1 or G#2 to fund drilling from cashflow going forward i think the market remains sceptical until they see stabilised flow rates from the wells - remember G#1 & G#2 were going to fund all future drills going forward back in 2019/2020 and we know how that panned out ......
One glaring omission from the announcement this morning G#1 current production looks to be down to about 4mmcf/d and 30 BOPD. They really must be confident in these next wells to be taking further prepayments (before existing prerepayments have been fully repaid and they still have residual unpaid E#2 well costs of ~$6M) to be confident enough to drill their way out of a cashflow crunch ......
- Forums
- ASX - By Stock
- Ann: DRILLING PROGRAM AND CURRENT PRODUCTION Update
Fair to say the market has baked in a lot of this news...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BYE (ASX) to my watchlist
|
|||||
Last
5.2¢ |
Change
-0.002(3.70%) |
Mkt cap ! $56.09M |
Open | High | Low | Value | Volume |
5.3¢ | 5.4¢ | 5.2¢ | $82.59K | 1.562M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 140266 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.3¢ | 18342 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 140285 | 0.052 |
2 | 919878 | 0.051 |
3 | 129597 | 0.050 |
2 | 426772 | 0.046 |
2 | 149673 | 0.045 |
Price($) | Vol. | No. |
---|---|---|
0.053 | 60706 | 2 |
0.054 | 158451 | 2 |
0.055 | 332256 | 6 |
0.056 | 223855 | 3 |
0.058 | 291218 | 3 |
Last trade - 15.16pm 10/07/2024 (20 minute delay) ? |
Featured News
BYE (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online