    I’m not sure what the average metres per day of RC drilling is and it’s likely dependent on lots of factors. Let’s, for arguments sake, assume a base rate of 100m/day per rig. So with one rig, 100,000m would take 1,000 days. How many rigs to achieve 100,000m in 12 months? Would need 3 rigs (actually 2.7 but we’ll round up) operating full time drilling 100m/ day for 365 days to drill 100,000m. Obviously this could be more or less based on the average depth drilled each day via RC drilling. Anyone have a clue about this rather than my waffle?
 
watchlist Created with Sketch. Add PTN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.