BRU 0.00% 8.2¢ buru energy limited

Rig selection and availabilityAfter an invitation to tender...

  1. 5,178 Posts.
    lightbulb Created with Sketch. 589
    Rig selection and availability
    After an invitation to tender (ITT) process, the Ensign 963 rig has been selected as the
    preferred rig for the drilling program. Buru has now entered into a Letter of Intent (LOI) for
    the rig including an initial payment for the commencement of mobilisation. Formal contract
    negotiations in accordance with the LOI are in progress to be concluded in due course.
    The ITT requirements were for a fully crewed, high capacity rig, capable of drilling the deep
    Rafael 1 exploration well and the Ungani 8 horizontal well.
    There are few rigs in Australia capable of meeting these requirements and the Company is
    pleased that the Ensign 963 is available in the time frame required to meet the program
    objectives.
    The timing of the start of the program is partly dependent on the timing of the
    necessary pre-acceptance maintenance and function checks required to be carried out by
    Ensign, and also on Buru’s rig acceptance inspections, with the rig currently expected to be
    on the Kurrajong 1 drilling location in late May to early June.
    Last edited by JustSayin: 14/04/21
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.