HE 1 waitin on Long Lead Items, whatever they might be, I believe NHE have everything ready to go and the Marriot crew can build and pull down a rig like the SAS can strip and build their favourite weapon
- Forums
- ASX - By Stock
- NHE
- Ann: Drilling rig on site at Mbelele, North Rukwa Project
Ann: Drilling rig on site at Mbelele, North Rukwa Project, page-3
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NHE (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.7¢ |
Change
-0.002(2.90%) |
Mkt cap ! $31.80M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.7¢ | $13.52K | 199.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10223 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 297999 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10223 | 0.067 |
1 | 50002 | 0.066 |
2 | 59706 | 0.065 |
1 | 88000 | 0.063 |
1 | 133390 | 0.062 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 297999 | 2 |
0.070 | 102952 | 4 |
0.071 | 139602 | 2 |
0.072 | 15000 | 1 |
0.079 | 100000 | 1 |
Last trade - 11.51am 14/06/2024 (20 minute delay) ? |
|
|||||
Last
6.7¢ |
  |
Change
-0.002 ( 1.52 %) |
|||
Open | High | Low | Volume | ||
6.7¢ | 6.7¢ | 6.7¢ | 4700 | ||
Last updated 11.06am 14/06/2024 ? |
Featured News
NHE (ASX) Chart |