NHE 2.90% 6.7¢ noble helium limited

Ann: Drilling rig on site at Mbelele, North Rukwa Project, page-2

  1. 3,911 Posts.
    lightbulb Created with Sketch. 927
    When will spud be?

    Still Q3? Or likely early Q3?

    HE1 tweeted they were rigging up their rig a month ago and still yet to spud their well.

    However HE1 bought their rig and first time operating it so potentially much slower than NHE hiring a rig from Marriott and crew.



    https://hotcopper.com.au/data/attachments/5596/5596622-6d5a3545e1b98b2f16210f9b5a5b2a3c.jpg
    https://hotcopper.com.au/data/attachments/5596/5596625-a7ab388c04e4b0400dceb33a390b5e93.jpg
 
watchlist Created with Sketch. Add NHE (ASX) to my watchlist
(20min delay)
Last
6.7¢
Change
-0.002(2.90%)
Mkt cap ! $31.80M
Open High Low Value Volume
6.8¢ 6.9¢ 6.7¢ $13.52K 199.2K

Buyers (Bids)

No. Vol. Price($)
1 10223 6.7¢
 

Sellers (Offers)

Price($) Vol. No.
6.9¢ 297999 2
View Market Depth
Last trade - 11.51am 14/06/2024 (20 minute delay) ?
Last
6.7¢
  Change
-0.002 ( 1.52 %)
Open High Low Volume
6.7¢ 6.7¢ 6.7¢ 4700
Last updated 11.06am 14/06/2024 ?
NHE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.