Feasibility study undertaking was originally announced last December (2020) and promised to be released in January 2020. Well, one year has gone by and nothing has happened, perhaps it was lost in the mail, blame the postie
.
- Forums
- ASX - By Stock
- ANL
- Ann: DRILLING SCHEDULED AT GIRO GOLD PROJECT
Ann: DRILLING SCHEDULED AT GIRO GOLD PROJECT, page-62
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ANL (ASX) to my watchlist
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.74M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ANL (ASX) Chart |
Day chart unavailable