re: Ann: Drilling Starts at Hendrix Gold Proj... Excelent ann 5 g/t au what if there is a minimum 2million ton, @ todays 1720grms x 2mil = $3,440,000,00 and just up the road from our mother load, keeping positive as you can see,not long to go.
I feel sorry for the doughtful
Add to My Watchlist
What is My Watchlist?