MXR 3.23% 3.0¢ maximus resources limited

Ann: Drilling starts at Hilditch West Gold target, page-2

  1. 8,087 Posts.
    lightbulb Created with Sketch. 385
    Certainly sounds promising. The other plus is that gives us another lot of results to come. There must be quite a stack of future announcements that will start flowing in the weeks ahead. Surely there ought to be some pieces of very good news and data among them.

    I have noted down all the announcements since 29th April which detail activity that we are to get results from.
    • 29 April - Mineral Resource Estimate to be worked on
    • 11 May - Drilling results from S5 with some promising finds
    • 12 May - Some high grades at Redback with follow up drilling to be undertaken
    • 19 May - Drilling campaign underway at Karramindie ( 3 holes for 400 metres) and Yilmia (800 metres)
    • 21 May - Drilling started at Yilmia
    • 31 May - Drilling started at Larkinville (1,500 metres)
    • 08 June - Drilling started at Wattle Dam Gold mine (Stockwork for MRE) = 1,500 metres........ plus WD North
    • 15 June - Drilling now starts at Hilditch West
    They are certainly going to be keeping the lab busy
 
watchlist Created with Sketch. Add MXR (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.001(3.23%)
Mkt cap ! $12.83M
Open High Low Value Volume
3.0¢ 3.0¢ 3.0¢ $291 9.703K

Buyers (Bids)

No. Vol. Price($)
1 263632 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 5000 1
View Market Depth
Last trade - 16.10pm 30/08/2024 (20 minute delay) ?
MXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.