Drilling to commence this month at Turner River High-Grade Lithium area
• RC Drilling is scheduled to commence in the last week of November at QXR’s Turner River hard rock lithium project.
• The maiden 1,500 metre RC drilling programme will target three areas, including the high-grade lithium areas in rock samples.
• Recently announced high-grade lithium samples included 1.6% Li2O, 1.1% Li2O and 4.9% Li2O over an area 350 metres x 200 metres which now extends under cover (Carbonate Hill).
• Drilling will also cover two other pegmatites with anomalous lithium results.
• Further surface sampling and a geophysical survey is also being planned.
- Forums
- ASX - By Stock
- QXR
- Ann: Drilling to commence this month at Turner River Lithium
QXR
qx resources limited
Add to My Watchlist
0.00%
!
0.3¢

Ann: Drilling to commence this month at Turner River Lithium, page-3
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.930M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1310098 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 4375989 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1310098 | 0.003 |
23 | 18728675 | 0.002 |
9 | 35500008 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 4375989 | 12 |
0.005 | 3195104 | 9 |
0.006 | 2819046 | 7 |
0.007 | 241587 | 1 |
0.008 | 2250000 | 3 |
Last trade - 16.12pm 17/06/2025 (20 minute delay) ? |
Featured News
QXR (ASX) Chart |
Day chart unavailable
The Watchlist
RC1
REDCASTLE RESOURCES LIMITED
Ronald Miller, Non-Executive Director
Ronald Miller
Non-Executive Director
SPONSORED BY The Market Online