• 5,000 metres of combined reverse circulation (RC) and diamond
drilling planned
• RC drilling scheduled to commence mid-late October with
diamond drilling set to commence from November 2020
• Drilling will target 600m of highly prospective strike along the
Burbanks Shear between Main Lode and Burbanks North
deposits below encouraging RC results from 2019, including:
o BBRC303 – 8m @ 4.10g/t Au from 159m down-hole
o BBRC292 – 3m @ 5.38g/t Au from 185m down-hole, and
o BBRC294 – 4m @ 2.58g/t Au from 168m down-hole
• Previous drilling tested to 100 metres below surface, the
forthcoming program will target between 130 and 350 metres
below surface
• The program is estimated to take 4 to 6 weeks, with first results
to be announced approx. 2 weeks from program completion
- Forums
- ASX - By Stock
- Ann: Drilling to Re-commence at Burbanks
• 5,000 metres of combined reverse circulation (RC) and diamond...
-
- There are more pages in this discussion • 66 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)