Hi mulac1
The figure I have seen when the value of the near surface has been discussed is about $200M profit. If that is confirmed by a scoping study I would be thinking the next step is to get some debt financing to proceed. Plenty of work to get that stage.. i.e. environmental approvals, mining approvals etc. but the possibility for enough cash to come in the door probably exists.
When I was trying to forecast how the SP might move I factored in the scoping study as a given and positive drill results a high probability. The scoping study should have put SGQ above 20 cents ... and the results a wild card. As it turned out everything went pear shaped. But I can see nothing wrong with those SP estimates once things get back on the rails.
- Forums
- ASX - By Stock
- SGQ
- Ann: Drilling to Resume at Mt Alexander
Ann: Drilling to Resume at Mt Alexander, page-37
-
-
- There are more pages in this discussion • 206 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $33.61M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 4400000 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 127961 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 850000 | 0.038 |
3 | 2297116 | 0.037 |
2 | 2205833 | 0.036 |
1 | 1508000 | 0.035 |
4 | 1236293 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 127961 | 3 |
0.035 | 1011683 | 4 |
0.038 | 106916 | 2 |
0.039 | 345000 | 2 |
0.040 | 756667 | 5 |
Last trade - 16.12pm 05/08/2024 (20 minute delay) ? |
Featured News
SGQ (ASX) Chart |
Day chart unavailable