Sorry but I completely disagree. Exploration + Drilling Results is how we have achieved the previous ATH's. The market loves it. We are still fast tracking Manna, doing this in the background with Marble is not harming our Manna fast tracking. We are lucky in the fact we have millions in the bank that we can actually do this. It will be beneficial in the long run having at least explored Marble and giving us a head start to get Marble to production of exploration is good which I'm assuming it will be based off what we already know. All this whilst Manna still aiming for 2026 production. Having 2 projects is amazing, im sure Ron knows what he is doing. What we also have to realise we possibly will have a DSO operation within the next 12 months bringing in more cash to further help. All imo.![]()
- Forums
- ASX - By Stock
- Ann: Drilling Underway at Marble Bar Lithium Project
Sorry but I completely disagree. Exploration + Drilling Results...
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GL1 (ASX) to my watchlist
|
|||||
Last
26.0¢ |
Change
0.005(1.96%) |
Mkt cap ! $67.66M |
Open | High | Low | Value | Volume |
25.0¢ | 26.0¢ | 25.0¢ | $35.99K | 139.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 180995 | 25.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
26.0¢ | 3790 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 180995 | 0.255 |
6 | 352933 | 0.250 |
2 | 270000 | 0.245 |
4 | 21840 | 0.240 |
4 | 96965 | 0.235 |
Price($) | Vol. | No. |
---|---|---|
0.260 | 3790 | 1 |
0.270 | 10000 | 1 |
0.275 | 41450 | 3 |
0.285 | 5424 | 1 |
0.290 | 13353 | 2 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
GL1 (ASX) Chart |