STN 2.08% 24.5¢ saturn metals limited

Ann: Drilling Underway - High Grade West Wyalong Project, page-53

  1. 89 Posts.
    lightbulb Created with Sketch. 21
    I agree about the timing. Doubt it would be COVID as so many explorers are very active in NSW (and exploration had no restrictions). Doing some quick maths: 2,200m of DD is underway in four holes starting 26 June. Average DD rates of ~35m a day would mean two months to wrap this campaign up. Now 4 months in. Even factoring in some mob-demod taking a long time. They should have drilled to depth by now on a few of the holes. No visuals of the DD core may mean nothing substantial (thinking visible gold) which you would expect with a system of high grade like this.
 
watchlist Created with Sketch. Add STN (ASX) to my watchlist
(20min delay)
Last
24.5¢
Change
0.005(2.08%)
Mkt cap ! $54.88M
Open High Low Value Volume
24.0¢ 24.5¢ 24.0¢ $7.664K 31.78K

Buyers (Bids)

No. Vol. Price($)
2 90475 24.5¢
 

Sellers (Offers)

Price($) Vol. No.
25.0¢ 10000 1
View Market Depth
Last trade - 12.10pm 31/05/2024 (20 minute delay) ?
Last
25.0¢
  Change
0.005 ( 6.38 %)
Open High Low Volume
24.5¢ 25.0¢ 24.5¢ 90443
Last updated 15.37pm 31/05/2024 ?
STN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.