Summary
• Hole 20AU003 has been completed on target A6 to a total depth of 615m at the Aurora Prospect
• The hole was extended beyond the planned depth as favourable geology was intersected
• The HQ core is currently being logged in Fairbanks and prepared for assay
• The rig has moved to Target A13NE, adjacent to “Half Ounce Gulch” and commenced drilling
• Drilling to continue through June and July – with 4 to 6 holes planned (2200m minimum)
• Geophysical surveys (ZTEM & Magnetics) to commence next week
• Assay results planned to be released upon program completion
- Forums
- ASX - By Stock
- RML
- Ann: Drilling Update - 64North Project Alaska
Ann: Drilling Update - 64North Project Alaska, page-2
-
- There are more pages in this discussion • 84 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RML (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.220M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $4.02K | 2.009M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1313698 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 5411657 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1313698 | 0.002 |
37 | 55093712 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 5411657 | 6 |
0.004 | 2849501 | 7 |
0.005 | 1004122 | 8 |
0.006 | 1000001 | 1 |
0.008 | 2050000 | 2 |
Last trade - 10.41am 04/10/2024 (20 minute delay) ? |
Featured News
RML (ASX) Chart |