MAY 3.64% 5.3¢ melbana energy limited

Ann: Drilling update at Alameda-1 - Significant Oil Interval, page-10

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3828
    Next update wlll b the key for this drilled section, once they complete WL logging.

    It's about 1000m open hole drilled in the 8.5" section from 2592m to 3590m. Log it & then run the 7" liner to safe guard this zone.

    Hope they can get more oil samples to establish what sort of Recovery rates, pressure, any associated gas & Oil quality is there along with Net/gross pay zone ratio, oil saturation, movable HC's, porosity/perm etc etc.

    Fluid Sampling & pressure data hold the key to understand and improve upon the 5% Recovery rates in that part of the world.
    Well done to those who've held on since the shallow zone discovery.
    Last edited by Ya: 07/02/22
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
-0.002(3.64%)
Mkt cap ! $178.6M
Open High Low Value Volume
5.6¢ 5.6¢ 5.2¢ $139.5K 2.572M

Buyers (Bids)

No. Vol. Price($)
8 122484 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 500000 1
View Market Depth
Last trade - 16.10pm 07/05/2024 (20 minute delay) ?
Last
5.4¢
  Change
-0.002 ( 0.00 %)
Open High Low Volume
5.5¢ 5.5¢ 5.2¢ 1076722
Last updated 15.59pm 07/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.