MAY 25.0% 2.4¢ melbana energy limited

I think your asking will the rig complete the well?As far as I...

  1. 3,120 Posts.
    lightbulb Created with Sketch. 1038
    I think your asking will the rig complete the well?
    As far as I know this rig will run the completions and install the Christmas tree and assume that a wire line rig will run the perforations
    Some times this can and is done with a smaller workover rig but I think we're pretty keen to see how this one flows so I'd assume the big rig will hang on it.
    There's alot to do before any of these decisions are made, we're still unsure what we have and what we want to test, need to work it all out and come up with a completions program
    It's big

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
-0.008(25.0%)
Mkt cap ! $80.88M
Open High Low Value Volume
2.8¢ 2.9¢ 2.3¢ $1.185M 47.20M

Buyers (Bids)

No. Vol. Price($)
21 4322462 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 1525000 2
View Market Depth
Last trade - 14.19pm 11/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.