MAY 4.35% 2.2¢ melbana energy limited

Ann: Drilling update at Alameda-1 - Significant Oil Interval, page-575

  1. 915 Posts.
    lightbulb Created with Sketch. 26
    “Logging Operations - N Structure
    An initial set of logs have been successfully conducted from 3,617mMD back to the 9-5/8” shoe at 2,577mMD. A final logging run that aims to conduct a formation pressure test over this interval (that may yield additional information that would assist with the design of testing operations and the running/cementing of casing) is currently underway and expected to conclude in the next day or so.”
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.