MAY 6.25% 3.0¢ melbana energy limited

“Logging Operations - N StructureAn initial set of logs have...

  1. 915 Posts.
    lightbulb Created with Sketch. 26
    “Logging Operations - N Structure
    An initial set of logs have been successfully conducted from 3,617mMD back to the 9-5/8” shoe at 2,577mMD. A final logging run that aims to conduct a formation pressure test over this interval (that may yield additional information that would assist with the design of testing operations and the running/cementing of casing) is currently underway and expected to conclude in the next day or so.”
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.002(6.25%)
Mkt cap ! $101.1M
Open High Low Value Volume
3.1¢ 3.1¢ 2.8¢ $248.3K 8.453M

Buyers (Bids)

No. Vol. Price($)
4 750509 2.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 24364 1
View Market Depth
Last trade - 16.10pm 05/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.