MAY 4.65% 4.1¢ melbana energy limited

Ann: Drilling Update at Alameda-1, page-2

  1. 1,426 Posts.
    lightbulb Created with Sketch. 73
    Logging of the 8-1/2” hole section has been successfully completed. Melbana’s geoscientists and consultants are now conducting a detailed analysis of the data obtained, a preliminary review of which indicate several porous zones which are naturally fractured. Drilling operations are expected to resume by the end of this week, subject to the satisfactory completion of well integrity and control tests.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
4.1¢
Change
-0.002(4.65%)
Mkt cap ! $138.1M
Open High Low Value Volume
4.2¢ 4.3¢ 4.1¢ $184.4K 4.395M

Buyers (Bids)

No. Vol. Price($)
11 946604 4.1¢
 

Sellers (Offers)

Price($) Vol. No.
4.2¢ 250000 1
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.