"The programme is likely to total around 2,000m of the 3,000m planned; this is
due to a much shallower dip of the pegmatite than interpreted – around ‐15
degrees rather than the ‐35 degrees as predicted thus requiring much shallower
test holes."
Know next to nothing about drilling etc, but can we take the above statement as a small positive ?
"The programme is likely to total around 2,000m of the 3,000m...
Add to My Watchlist
What is My Watchlist?