Reckon this new RC drill scissor hole 24MERC003's intersecting over 60m of visual disseminated sulphides (67m @ 1-2% sulphides (MFBZ)) at least starts to look like (imo) reducing/excluding one of the possibilities that were discussed here before (that the 'discovery hole' 24MERC028 might be contaminated (in its sent samples) hence the initial 71m@ 2.8%Cu might not hold..). So it's positive to say the least plus they are going to drill four nearby (new) prospects when rain stops (Brisbane also only just stopped raining over the weekend so the weather is a bit crazy this year considering it's April already). Only 2~3 weeks to go for the assay results. Fingers crossed more positive news/update will be coming in (plus they've still got enough fund and have a small/tight register).
- Forums
- ASX - By Stock
- Ann: Drilling update for Brumby Ridge Mt Isa East Project
Reckon this new RC drill scissor hole 24MERC003's intersecting...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPM (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.3¢ |
Change
-0.005(7.35%) |
Mkt cap ! $4.936M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.3¢ | $32.69K | 504.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 161468 | 6.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 13500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 161468 | 0.063 |
5 | 158774 | 0.062 |
4 | 812938 | 0.061 |
1 | 500000 | 0.060 |
2 | 250000 | 0.059 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 13500 | 1 |
0.070 | 10000 | 1 |
0.071 | 18674 | 1 |
0.074 | 52008 | 2 |
0.075 | 358153 | 3 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
CPM (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online