Just noticed from the last 2 announcements that drilling of the 33000 Siemens conductor commenced on 22 Feb, ( announced on 23 Feb) and the later announcement dated March 1 stated the hole was at 115 metre down hole depth. Thats 7 days to drill 115 metres !! Now diamond core drilling is typically 30 - 50 metres per day ( single shift). Somethings not adding up to me.
- Forums
- ASX - By Stock
- Ann: Drilling Update for Mt Alexander
Just noticed from the last 2 announcements that drilling of the...
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $27.21M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
SGQ (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online