FBM 0.00% 2.5¢ future battery minerals limited

Ann: DRILLING UPDATE FOR THE HIGH-GRADE NEPEAN NICKEL PROJECT, page-6

  1. 17,023 Posts.
    lightbulb Created with Sketch. 3834
    Think they need to provide more details on the cross-section diagrams.  I assume they are saying there is potentially a second mineralized ore body next to an old working shaft south of the main Nepean shaft.

    Capture.PNG
 
watchlist Created with Sketch. Add FBM (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
0.000(0.00%)
Mkt cap ! $16.55M
Open High Low Value Volume
2.5¢ 2.6¢ 2.4¢ $20.36K 813.9K

Buyers (Bids)

No. Vol. Price($)
1 57445 2.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 12428 1
View Market Depth
Last trade - 14.54pm 23/07/2024 (20 minute delay) ?
FBM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.