RRS 0.00% 0.1¢ range resources limited

Ann: Drilling Update - Smith No 1 Well, Texas , page-3

  1. 391 Posts.
    lightbulb Created with Sketch. 6

    approx 500m to go.... formations at that depth can be quite hard and drilling slow to reduce wear and breakages they may have to pull out of hole to replace drilling head before TD, then we wait for logging resaults.
 
watchlist Created with Sketch. Add RRS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.