Next Steps
The Company intends to progressively develop its flagship projects and further updates will be provided to the market on the following steps in this campaign:
• Assay results pending from the Airstrip Cu-Ag drill program that targeted beneath and along strike of known mineralisation
• Drilling results from Dibete and Maibele North
• Review Maibele North Ni-Cu-PGE Mineral Resource Estimate (MRE) to include infill drill program and US$5 million spent on historical drilling by previous operators that has not been incorporated into the current MRE
• Undertake a review of potential open pit mining and Ni-Cu-PGE sulphide production
• Develop 2024 field campaign to advance multiple targets within the broader project tenure
- Forums
- ASX - By Stock
- SI6
- Ann: Drilling Update Strong Sulphides at Maibele
Ann: Drilling Update Strong Sulphides at Maibele, page-2
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SI6 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.738M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $500 | 250K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
39 | 56754840 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 15448277 | 20 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
39 | 56754840 | 0.002 |
22 | 86523599 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 15448277 | 20 |
0.004 | 23420504 | 21 |
0.005 | 6239355 | 14 |
0.006 | 8465386 | 8 |
0.007 | 6645815 | 14 |
Last trade - 11.57am 27/06/2024 (20 minute delay) ? |
Featured News
SI6 (ASX) Chart |