VEC 0.00% 1.2¢ vector resources limited

Hey @jawburns This is from the 2011 Environmental Impact Study....

  1. 7,723 Posts.
    lightbulb Created with Sketch. 3552
    Hey @jawburns This is from the 2011 Environmental Impact Study.
    Power Supply
    Power will be a combination of hydropower from the existing (and soon to be rehabilitated) Budana hydropower station and thermal generated (diesel) power supply generated on site.

    If you would like to see actual up to date video footage of ADIDI-KANGA GOLD MINE and all of the equipment go to https://twitter.com/VECResources

    Hope this helps with your research mate
 
watchlist Created with Sketch. Add VEC (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.