STX 2.44% 21.0¢ strike energy limited

Ann: DUG Australia Conference Presentation, page-2

  1. 5,348 Posts.
    lightbulb Created with Sketch. 2642
    A nice run-down on estimated costs and targeted production rates to commerciality.

    * potential ex-field costs $4.50 / GJ
    * potential >$1.2m per well per annum EBITDA
    * 50 wells = $60m EBITDA p.a, 400 wells $480m p.a
    * going off the slide on page 13 it suggests that they are looking for a 300 mcf/d flow from the small klebb 1 frac as a basis for extrapolating the production levels on larger fracs which will be the case for the roll-out of project development.
    * LeChiffre is closer to the likely size of frac used I would have thought.
    * Good to see they will be in the lower cost of production part of the curve
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
21.0¢
Change
0.005(2.44%)
Mkt cap ! $587.4M
Open High Low Value Volume
20.5¢ 21.0¢ 20.0¢ $886.1K 4.323M

Buyers (Bids)

No. Vol. Price($)
49 716319 20.5¢
 

Sellers (Offers)

Price($) Vol. No.
21.0¢ 1047595 36
View Market Depth
Last trade - 12.03pm 18/09/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.