CTP central petroleum limited

Ann: Dukas exploration program update, page-33

  1. 24,386 Posts.
    lightbulb Created with Sketch. 176
    I made several other researches myself about rigs and availability.

    In will post them one at the time and it is for you to either read them or ignore them.

    I simply call a spade a spade regardless as I have no wheelbarrow full of personal agendas to push, unlike possibly many others would be if they could be:

    "( To everyone, this article was written on the 1st of APRIL 2009. More that eleven years ago.

    ""Offshore oil and gas operations continue to trend towards developing high-pressure/high-temperature (HP/HT) fields. Over the last decade, the industry has developed completion solutions for wells up to 15,000 psi (103 MPa), and operators now require completions for wells up to 20,000 psi as a result of exploring further offshore, drilling in deeper water, and drilling to greater well depths.
    In response FMC Technologies has introduced a High Capacity (HC-20) 18 3⁄4-in. wellhead system rated to 20,000 psi. This advance in wellhead design took four years to complete. Of course, the completion of high-pressure wells presents several technical challenges due to a lack of equipment designed for these high pressures, but existing equipment and proven techniques can be applied successfully to overcome this issue.""
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
5.8¢
Change
0.004(7.41%)
Mkt cap ! $43.22M
Open High Low Value Volume
5.5¢ 5.8¢ 5.5¢ $10.67K 189.7K

Buyers (Bids)

No. Vol. Price($)
2 89166 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
5.8¢ 133753 3
View Market Depth
Last trade - 16.10pm 25/06/2025 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.