). Interestingly the JV has elected to not take up the second well option. However, with further appraisal drilling expected to be undertaken in tandem with pre-FEED studies, the JV could merely be taking advantage of greater rig availability in the Santos Basin and lower day rates to reduce future drilling costs.
They obviously don't read curjos thoughts of ' how hard it is to get rigs.... So logically you would keep drilling
- Forums
- ASX - By Stock
- Ann: Echidna-1 Progress Report No 4
). Interestingly the JV has elected to not take up the second...
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.53 |
Change
0.055(3.73%) |
Mkt cap ! $1.215B |
Open | High | Low | Value | Volume |
$1.48 | $1.53 | $1.47 | $8.888M | 5.912M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 7000 | $1.52 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.53 | 13273 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 7000 | 1.520 |
1 | 6867 | 1.515 |
2 | 61716 | 1.510 |
2 | 35229 | 1.505 |
6 | 84288 | 1.500 |
Price($) | Vol. | No. |
---|---|---|
1.530 | 13273 | 3 |
1.535 | 135223 | 4 |
1.540 | 49362 | 3 |
1.545 | 6867 | 1 |
1.550 | 7867 | 2 |
Last trade - 16.10pm 18/09/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |