Grok - seems to thinkThe Diamec Smart series is ideal for Gronnedal drilling (with diamond coated drill bits) (the percussion drilling last time use a circa 1983 equipment design).
https://www.epiroc.com/en-au/products/drill-rigs/exploration-drill-rigs/core-drilling-rigs/diamec-smart-8
The deep drilling version is supposedly good for 1400m
Consider this as all fantasy math and estimates - getting Grok punch out a delusion it can pluck incorrect figures or change figures when you re-run the same query.
It suggested the placement of $2M, is a 50% - 70% allocation of budget for the drilling programme (though there has been a history of script payment also).
Thus a likely 2000m to 4000m (2 or 3 rigs).
One of the shareholders prompted the idea of re-entering the existing drill hole collars.(which might only be another ~100m from the carbonatite core.
Less labour is required, but you paying a ~15-20% premium for the equipment. So could achieve 100k - 200k savings with less automated drilling equipment.Sensitivity: 2,000 Meters (10 holes, 2 rigs)
Drilling Costs: 2,000 m × $200/m = $400,000 Consumables: 2,000 m × $50/m = $100,000 Labor: 2 rigs × 35 days × $1,000 = $70,000 Mobilization: 2 rigs × $75,000 = $150,000 Setup/Re-entry: (8 new × $2,000) + (2 re-entry × $3,000) = $22,000 Geophysical Support: $50,000 Core Logging/Assays: 2,000 m × $50/m = $100,000 Overhead: 15% × ($400,000 + $100,000 + $70,000 + $150,000 + $22,000 + $50,000) = 15% × $792,000 = $118,800 Total Cost: $910,800 Per-Meter Cost: $910,800 ÷ 2,000 ≈ $455/m
Sensitivity: 4,000 Meters (20 holes, 3 rigs)
Drilling Costs: 4,000 m × $200/m = $800,000 Consumables: 4,000 m × $50/m = $200,000 Labor: 3 rigs × 50 days × $1,000 = $150,000 Mobilization: 3 rigs × $75,000 = $225,000 Setup/Re-entry: (16 new × $2,000) + (4 re-entry × $3,000) = $44,000 Geophysical Support: $50,000 Core Logging/Assays: 4,000 m × $50/m = $200,000 Overhead: 15% × ($800,000 + $200,000 + $150,000 + $225,000 + $44,000 + $50,000) = 15% × $1,469,000 = $220,350 Total Cost: $1,689,350 Per-Meter Cost: $1,689,350 ÷ 4,000 ≈ $422/m
Final Estimate
2,000 meters (10 holes, 2 rigs):
Cost: ~$910,800 Per-meter cost: ~$455/m Timeline: ~1–1.2 months 3,000 meters (15 holes, 2 rigs):
Cost: ~$1,245,450 Per-meter cost: ~$415/m Timeline: ~1.5–1.7 months 4,000 meters (20 holes, 3 rigs):
Cost: ~$1,689,350 Per-meter cost: ~$422/m Timeline: ~1.5–1.7 months Recommended: Use 2 rigs for 2,000–3,000 meters to stay within budget and complete in ~1–1.7 months (one season). For 4,000 meters, 3 rigs optimize efficiency within ~1.5–1.7 months.Notes
Per-meter cost variation: Higher for 2,000 meters due to fixed costs (mobilization, geophysics) spread over fewer meters. Economies of scale reduce per-meter costs at 3,000–4,000 meters. Cost drivers: Mobilization and labor are significant in Greenland’s remote setting. The Diamec Smart 8’s automation reduces labor and consumable costs compared to manual rigs. Budget optimization: Targeted drilling (geophysical guidance) and carbonatite’s faster rates (45 m/day) keep costs down. Re-entering historical boreholes saves ~$1,000/hole vs. new drilling.Recommendations
Select 2 rigs for 2,000–3,000 meters to minimize costs (~$0.9–1.25M) and complete in one season. Use geophysical data (magnetics, radiometrics) to target high-grade carbonatite zones, maximizing MRE contribution. Assess historical R-Core boreholes early to ensure stability for re-entry. Leverage Diamec Smart 8’s automation to maintain high drilling rates and reduce consumable costs.
- Forums
- ASX - By Stock
- Ann: Eclipse Metals Completes $2M Oversubscribed Placement
EPM
eclipse metals limited.
Add to My Watchlist
0.00%
!
1.3¢

Grok - seems to think The Diamec Smart series is ideal for...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $37.25M |
Open | High | Low | Value | Volume |
1.4¢ | 1.5¢ | 1.3¢ | $77.88K | 5.611M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 7005297 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 694350 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 6455297 | 0.013 |
9 | 2204833 | 0.012 |
5 | 2363636 | 0.011 |
7 | 1701598 | 0.010 |
2 | 1150000 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 694350 | 3 |
0.015 | 5089144 | 8 |
0.016 | 1750000 | 3 |
0.017 | 557270 | 2 |
0.018 | 2013632 | 1 |
Last trade - 16.10pm 13/06/2025 (20 minute delay) ? |
Featured News
EPM (ASX) Chart |