EGR 2.11% 9.7¢ ecograf limited

Ann: EcoGraf Lithium Valley Development, page-93

  1. 3,030 Posts.
    lightbulb Created with Sketch. 1135
    I should add that the additional 180 Gwh of battery manufacturing capacity is for Europe alone. The additional 180,000 tonnes of 99.95 percent pure graphite required by 2023 is for Europe alone. Far more is required in China, Asia and North America combined.
 
watchlist Created with Sketch. Add EGR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.