I'm pretty sure if the SPI was actually down the gurgler the company would be compelled to tell the ASX under continuous disclosure.
No, I can't explain why possible delays would not require a disclosure.
- Forums
- ASX - By Stock
- Ann: EdenCrete and EdenCretePz Approved by Florida DOT
I'm pretty sure if the SPI was actually down the gurgler the...
-
- There are more pages in this discussion • 85 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.216M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
EDE (ASX) Chart |
Day chart unavailable