If I'm using production cost of hydrogen then all of that that is accounted for already. Except for water, surfactants and the mixing process to create the final additive. Its still a very comfortable margin at USD25/gal and USD75/kg CNT, and I would think in line with quite a lot of industries which see markups of over 400% between cost of production and retail sales price.
Personally I think over 50% of the revenues will be profit, and it could be as high as 80%. The 20-30% figures that have been suggested are probably very conservative. I think mine would be more consistent with the funding proposed for plant expansion.
- Forums
- ASX - By Stock
- EDE
- Ann: EdenCrete Field Trial in GDOT New Highway Project
Ann: EdenCrete Field Trial in GDOT New Highway Project, page-41
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
-0.001(25.0%) |
Mkt cap ! $8.216M |
Open | High | Low | Value | Volume |
0.1¢ | 0.2¢ | 0.1¢ | $33 | 31.02K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
59 | 123582422 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 22032350 | 26 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 36499 | 0.002 |
59 | 123582423 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.001 | 26500 | 1 |
0.002 | 22036873 | 27 |
0.003 | 45021223 | 22 |
0.004 | 5941034 | 7 |
0.005 | 4631540 | 3 |
Last trade - 10.02am 13/09/2024 (20 minute delay) ? |
Featured News
EDE (ASX) Chart |