I agree the second pour is a good thing, IMO the reason behind the second pour is for GDOT to see consistent results, think its a no brainer, If im going to buy someones product I would want an second test done to confirm the first test so will have a consistency over many projects. If there an inconsistencies then
will have to look at why, ie wrong mix percent, different concrete manufacturer,etc
- Forums
- ASX - By Stock
- EDE
- Ann: EdenCrete Project - US Update
Ann: EdenCrete Project - US Update, page-78
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.216M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
EDE (ASX) Chart |
Day chart unavailable