ANN 26-8-16 Drill program copied and added below
The program comprises drilling a total of approximately 350 to 500 metres in ten (10) angled
diam
ond core drill holes spread over five (5) drill platforms utilizing one of Niuminco’s LongYear 38
drill rigs and crew.
All coring will be triple
-
tubed in HQ size rods to enhance recovery and a downhole survey will be
conducted every 12.5 metres and at end
hole depth for each hole.
The table below shows the planned drill hole details with vein intercepts expected at depths varying
from 17 to 40 metres.
It is hoped that drilling will be completed in late September to early October, 2016 and progressive
drill results will be announced to the market.
FID
- Forums
- ASX - By Stock
- Ann: Edie Cr Gold Intercepts in JORC Resource Drilling Program-NIU.AX
ANN 26-8-16 Drill program copied and added below The program...
-
- There are more pages in this discussion • 204 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NIU (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online