NIU 0.00% 2.0¢ niuminco group limited

ANN 26-8-16 Drill program copied and added below The program...

  1. 438 Posts.
    lightbulb Created with Sketch. 49
    ANN 26-8-16 Drill program copied and added below

    The program comprises drilling a total of approximately 350 to 500 metres in ten (10) angled
    diam
    ond core drill holes spread over five (5) drill platforms utilizing one of Niuminco’s LongYear 38
    drill rigs and crew.
    All coring will be triple
    -
    tubed in HQ size rods to enhance recovery and a downhole survey will be
    conducted every 12.5 metres and at end
    hole depth for each hole.
    The table below shows the planned drill hole details with vein intercepts expected at depths varying
    from 17 to 40 metres.

    It is hoped that drilling will be completed in late September to early October, 2016 and progressive
    drill results will be announced to the market.

    FID
    Last edited by FixItDad: 12/10/16
 
watchlist Created with Sketch. Add NIU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.