"Why does it need to cost that much just to e,tract and ship to South Korea?"
I am not an engineer, but...
Design and drawings for site and plant
Provision of infrastructure (power, water)
Earthworks for access to site
Earthworks for preparation of plant site
Earthworks for tailings dams
Formwork and laying of concrete foundations for plant, admin and staff buildings
Manufacture of plant items (mills, belts, floatation) to process ore
Assembly of plant, and associated buildings
Commissioning
I expect there is much more.
ASM are not just digging up ore and loading it on a truck.
Emma
- Forums
- ASX - By Stock
- Ann: EFA issues letter of support for the Dubbo Project
"Why does it need to cost that much just to e,tract and ship to...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASM (ASX) to my watchlist
(20min delay)
|
|||||
Last
68.5¢ |
Change
-0.010(1.44%) |
Mkt cap ! $124.0M |
Open | High | Low | Value | Volume |
69.0¢ | 71.5¢ | 68.5¢ | $167.5K | 240.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 36938 | 68.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
69.0¢ | 3667 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 22340 | 0.685 |
3 | 30100 | 0.680 |
1 | 2000 | 0.670 |
1 | 4500 | 0.665 |
2 | 7000 | 0.660 |
Price($) | Vol. | No. |
---|---|---|
0.690 | 3667 | 1 |
0.700 | 4285 | 1 |
0.750 | 6140 | 1 |
0.765 | 5000 | 1 |
0.780 | 36129 | 1 |
Last trade - 16.10pm 19/07/2024 (20 minute delay) ? |
Featured News
ASM (ASX) Chart |