GW1 9.09% 5.0¢ greenwing resources ltd

Ann: Efficiencies Identified For Expansion of Production, page-16

  1. 7,779 Posts.
    lightbulb Created with Sketch. 3315
    It could do. Graphite processing schematics suggest that there is a screening stage before and after grinding before entering the flotation stages.

    I only remember the recommissioned plant having one "dry" vibrating screen. Due to the clay content of saprolite (which would be sticky) maybe this type of screener is a necessity if hydraulic mining is going to be implemented. Granted, Stevo!

    Since Given is giving us the prompts like NL does with his graphite project, I think I may start looking into the potential cost savings of hydraulic mining aka NCZ. Zinc, after all, involves flotation processing.
 
watchlist Created with Sketch. Add GW1 (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
-0.005(9.09%)
Mkt cap ! $9.062M
Open High Low Value Volume
5.0¢ 5.0¢ 5.0¢ $802 16.04K

Buyers (Bids)

No. Vol. Price($)
1 12195 4.1¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 196 1
View Market Depth
Last trade - 15.02pm 12/07/2024 (20 minute delay) ?
GW1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.