looking at the graphic in the announcement the stoping panel they have is 40x40x2.5m is that correct? i.e. 4000 cubic metres (which at a SG of 3 is 12000 tonnes).
which means if they take it slowly and go for 3000t a month they have 4 months of production (at a profit) right there.
that buys plenty of time for more exploration, and ramp up at Paraguay and further review of Panga...
- Forums
- ASX - By Stock
- Ann: El Roble High Grade Production Rates Increase
looking at the graphic in the announcement the stoping panel...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)