re: Ann: El Roble High Grade Results up to 7.... Calculation of results as below for drill hole RCPCH00245; (true width is unknown. Calculations below assume a 100% true width)
2.8m @ 4.80% Cu and 1.63 g/t Au
= 2.9T Cu @ ~$7000 per tonne for $20,300
3.18 oz Au @ ~US$1290 oz for $4,102
Including;
0.80m @ 7.73% Cu and 1.70 g/t Au
= 0.11T Cu @ ~$7000 per tonne for $770
0.08 oz Au @ ~US$1290 oz for $103.20
Whilst the grade is okay, the widths would need to be greater in order to see economic intersections. (The other holes are smaller widths and lower grade so amounts will be lower than above for the other holes)
- Forums
- ASX - By Stock
- MNE
- Ann: El Roble High Grade Results up to 7.73% Copp
Ann: El Roble High Grade Results up to 7.73% Copp, page-9
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online