We are extracting a deadset minimum of 1500 tonnes from San Sebastián monthly, with a middle ground of 2700 tonnes simply through development. This number significantly increases alongside a significant increase in grade once blasting begins. Our 'deadset minimum' is break even for the company, which is fantastic news. It was a really transparent update!
- Forums
- ASX - By Stock
- MNE
- Ann: El Roble mining update
Ann: El Roble mining update, page-6
-
- There are more pages in this discussion • 82 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)