We are extracting a deadset minimum of 1500 tonnes from San Sebastián monthly, with a middle ground of 2700 tonnes simply through development. This number significantly increases alongside a significant increase in grade once blasting begins. Our 'deadset minimum' is break even for the company, which is fantastic news. It was a really transparent update!
- Forums
- ASX - By Stock
- MNE
- Ann: El Roble mining update
Ann: El Roble mining update, page-6
-
- There are more pages in this discussion • 82 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online