RNU renascor resources limited

Ann: Electrical Long Lead Equipment Installed and Commissioned, page-2

  1. 289 Posts.
    lightbulb Created with Sketch. 56
    Coming together nicely.....smile.png

    Renascor Resources Limited (ASX: RNU) (Renascor) is pleased to announce that SA Power Networks has completed a program of works to upgrade the electrical distribution network for Renascor’s proposed upstream graphite mining and processing operation in South Australia, the upstream portion of Renascor’s proposed Battery Anode Material (BAM) project, a vertically integrated graphite mining and downstream processing operation located in South Australia.

    Commenting, Renascor Managing Director David Christensen stated:

    The completion by SA Power Networks of the upgrades to the electricity distribution network is an important milestone in advancing the BAM project. The grid connection will not only result in cost savings in power generation, but Siviour will also benefit from a lower carbon footprint, reduced maintenance costs and increased efficiency and productivity.

    We are grateful to SA Power Networks for finishing these upgrades on time and on budget.”

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
7.0¢
Change
0.000(0.00%)
Mkt cap ! $178.0M
Open High Low Value Volume
7.0¢ 7.5¢ 6.9¢ $501.7K 6.997M

Buyers (Bids)

No. Vol. Price($)
7 491969 6.8¢
 

Sellers (Offers)

Price($) Vol. No.
7.0¢ 449155 3
View Market Depth
Last trade - 16.10pm 28/07/2025 (20 minute delay) ?
RNU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.