I realise this is probably a necessity but doesn't read as very "Ex-China" .... probably over there stealing the FlowSheet details and mixing in rat poison as we speak![]()
Renascor is also currently completing the processing of an approximately 730 tonne bulk sample of graphite ore from the Siviour Graphite Deposit The graphite ore, which is being processed into graphite concentrate at a commercial graphite facility in China using Renascor’s optimised flowsheet will be used as feedstock for the PSG demonstration facility.
GLTA aggott
Ann: Electrical Long Lead Equipment Installed and Commissioned, page-4
Add to My Watchlist
What is My Watchlist?