    I think 12 weeks is totally unrealistic for final permitting.
    I expect a decision to proceed with the mine in the third quarter 2021 and the start of operations late 2022.
    You cannot get a mine permit without a final mine plan and one of the main reasons for the new drilling program is to test near surface mineralization.
    This could substantially reduce the stripping ratio and have a significant impact on the bottom line.
    They are also testing potential new ore zones. A hit on any of these has the potential to move the dial.
    It is generally accepted that from discovery to development and operations takes about 8 years.
    ELT is more than two thirds along the road.If,as predicted,the tin price goes above $US20,000 a tonne ELT will be a comfortable ten bagger.
 
watchlist Created with Sketch. Add ELT (ASX) to my watchlist
(20min delay)
Last
12.5¢
Change
0.015(13.6%)
Mkt cap ! $24.34M
Open High Low Value Volume
11.0¢ 12.5¢ 11.0¢ $186 1.667K

Buyers (Bids)

No. Vol. Price($)
4 68308 11.0¢
 

Sellers (Offers)

Price($) Vol. No.
12.5¢ 214848 2
View Market Depth
Last trade - 15.59pm 12/07/2024 (20 minute delay) ?
ELT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.