COD 3.33% 14.5¢ coda minerals ltd

Ann: Elizabeth Creek Copper-Cobalt Project Positive Scoping Study, page-15

  1. 794 Posts.
    lightbulb Created with Sketch. 38
    Your figures seem good to me. Meanwhile on the Geology and treatment side there is considerable risk. So much of the whole equation carries risk. They need the Cobalt to hold it altogether as well as the Zinc and Silver. They need the Copper price to improve. They need the Au/USD to stay at or below 68 Cents. (Cant see this happening over 14 years). They need to have no price escalation in their construction costs and just to top it off they need to contend with inflation. It is very obvious they need a source of higher grade ore to blend with what they currently have.
 
watchlist Created with Sketch. Add COD (ASX) to my watchlist
(20min delay)
Last
14.5¢
Change
-0.005(3.33%)
Mkt cap ! $25.34M
Open High Low Value Volume
15.0¢ 15.0¢ 14.5¢ $14.78K 100.6K

Buyers (Bids)

No. Vol. Price($)
1 15586 14.5¢
 

Sellers (Offers)

Price($) Vol. No.
15.5¢ 57421 3
View Market Depth
Last trade - 15.53pm 29/05/2024 (20 minute delay) ?
Last
14.5¢
  Change
-0.005 ( 3.33 %)
Open High Low Volume
14.5¢ 14.5¢ 14.5¢ 12900
Last updated 15.53pm 29/05/2024 ?
COD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.